Day 32
i've sanded the interior of the tank using 280 grit sandpaper in preparation for the final lamination tomorrow...
i've spotted a few rough surfaces upon sanding the masilya so more patching was done instead of already painting the stand...
the right face of the tank was also installed today using 1/2 ply. dimension of which is 31.5" length and 27" height...
i also managed to seal the overflow today. the panel that was used was coated with epoxy first and then it was glued and screwed to the main tank...
i will be sealing the rear sump tomorrow and probably do some painting on the stand. the final lamination will also be done tomorrow. more updates to come and thanks for viewing.